    汶川震区映秀镇“8·14”特大泥石流灾害调查

    唐川 李为乐 丁军 黄翔超

    唐川, 李为乐, 丁军, 黄翔超, 2011. 汶川震区映秀镇“8·14”特大泥石流灾害调查. 地球科学, 36(1): 172-180. doi: 10.3799/dqkx.2011.018
    引用本文: 唐川, 李为乐, 丁军, 黄翔超, 2011. 汶川震区映秀镇“8·14”特大泥石流灾害调查. 地球科学, 36(1): 172-180. doi: 10.3799/dqkx.2011.018
    TANG Chuan, LI Wei-le, DING Jun, HUANG Xiang-chao, 2011. Field Investigation and Research on Giant Debris Flow on August 14, 2010 in Yingxiu Town, Epicenter of Wenchuan Earthquake. Earth Science, 36(1): 172-180. doi: 10.3799/dqkx.2011.018
    Citation: TANG Chuan, LI Wei-le, DING Jun, HUANG Xiang-chao, 2011. Field Investigation and Research on Giant Debris Flow on August 14, 2010 in Yingxiu Town, Epicenter of Wenchuan Earthquake. Earth Science, 36(1): 172-180. doi: 10.3799/dqkx.2011.018

    汶川震区映秀镇“8·14”特大泥石流灾害调查

    doi: 10.3799/dqkx.2011.018
    基金项目: 

    国家重点基础研究发燕尾服计划“973”项目 2011CB409903

    国家自然科学基金 40772206

    地质灾害防治地国家重点实验室自主研究基金 SKLGP2009Z2004

    详细信息
      作者简介:

      唐川(1961-), 男, 博士, 教授, 博士生导师, 主要从事地质灾害、环境地质遥感与GIS应用研究.E-mail: tangc@cdut.edu.cn

    • 中图分类号: P315;X141

    Field Investigation and Research on Giant Debris Flow on August 14, 2010 in Yingxiu Town, Epicenter of Wenchuan Earthquake

    • 摘要: 2010年8月14日强降雨过程导致汶川震区映秀镇红椿沟泥石流暴发, 泥石流堰塞堆积体堵断岷江主河道, 导致河水改道冲入映秀新镇, 引发洪水泛滥; 造成映秀镇13人死亡、59人失踪, 受灾群众8 000余人被迫避险转移.由于这场泥石流灾害发生在汶川地震震中区, 是地震与降雨共同作用下的结果, 研究其形成与成灾过程对于进一步认识强震区泥石流发育特征具有重要的意义.根据现场调查和航空图像解译, 分析了红椿沟泥石流流域特征, 特别是地震条件下的泥石流物源特征, 在此基础上讨论了泥石流起动过程和堆积过程.红椿沟泥石流典型实例表明了汶川震区泥石流已进入一个新的活跃期.因此, 应该开展对汶川地震区的泥石流风险评估和监测、早期预警等研究, 采取有效的工程措施控制泥石流的发生和危害.

       

    • 图  1  摄于2008年5月18日的航空影像反映的红椿沟泥石流流域特征及地震诱发的滑坡特征

      Fig.  1.  Aerial photograph taken on 18 May, 2008 shows the drainage area of the Hongchun debris flow and characterization of the earthquake induced landslides

      图  2  泥石流暴发前后映秀镇降雨累积

      Fig.  2.  Cumulative curve of rainfall prior to and after debris flow occurrence in the Yingxiu town

      图  3  泥石流起动区的滑坡体被表层水流冲蚀成的沟道

      Fig.  3.  Surface-flow eroded the gully in the landslide deposits of debris flow initiation area

      图  4  H1滑坡溃决后的沟道特征

      Fig.  4.  Channel features after outburst of H1 landslide in debris flow basin

      图  5  红椿沟泥石流发生前后堆积扇特征

      a.泥石流发生后形成的大型堆积扇,阻断岷江河道,掩埋公路;b.泥石流发生前的老堆积扇

      Fig.  5.  Depositional characteristics of the Hongchun valley prior to and after "8·14"debris flow occurrence

      图  6  摄于2010年8月15日的航空照片反映了红椿沟泥石流扇及其壅塞堆积体,以及映秀新镇洪水泛滥灾情(由四川省地质环境监测总站提供)

      Fig.  6.  Aerial photo taken on August 15, 2010 shows the Hongchun debris flow fan and natural dam, and inundation in newly reconstructed Yingxiu town

      图  7  映秀新镇被洪水泛滥,洪水水深2.0~3.5 m,水淹时间长达7日

      Fig.  7.  Newly reconstructed Yingxiu town was flooded due to debris flow dam. Flood water-depth was estimated at 2.0-3.5 m and flood duration lasted 7 days

      图  8  泥石流搬运的最大巨石,其长、宽、高分别为8.5 m×4.5 m×4.0 m

      Fig.  8.  Maximum size boulders with length, width and height of 8.5 m×4.5 m×4.0 m, transported by debris flow

      图  9  颗粒分布曲线

      Fig.  9.  Particle distributions of sediment in debris flows

      表  1  映秀镇红椿沟“8·14”特大泥石流总量计算

      Table  1.   Calculated results of total volume of debris flows

      堆积扇总面积(m2) 壅塞体面积(m2) 壅塞体度(m) 壅塞体泥砂量(104 m3) 扇体上段堆积面积(m2) 扇体上段堆积厚度(m) 扇体上段扇堆积泥砂量(104 m3) 泥石流总量(104 m3)
      96 510 49 700 7~9 39.7 78 500 2.0~6.0 31.4 71.1
      下载: 导出CSV

      表  2  泥石流容重计算

      Table  2.   Calculation of densities of debris flows

      P2(%) P05(%) γd(g/cm3) C
      断面1-1' 67.1 8.6 2.07 0.629
      断面2-2' 75.4 5.1 2.03 0.606
      平均 71.25 6.85 2.05 0.618
      下载: 导出CSV

      表  3  泥石流的运动速度、流量和总量计算

      Table  3.   Calculation of velocity, discharge and volume of debris flows

      R(m) S D50(mm) D10(mm) A(m2) V(m/s) Q(m3/s) T(s) Wc(104 m3) Ws(104 m3)
      断面1-1' 1.15 0.15 3.7 0.08 86.0 8.67 745.76 5 400 80.5 49.7
      断面2-2' 2.61 0.16 4.3 0.25 88.7 7.85 696.45 5 400 75.2 46.5
      下载: 导出CSV

      表  4  泥石流冲击力计算

      Table  4.   Calculation of impact force of debris flows

      C1(m/s) Ad(m2) Vd(m/s) ρd(kg/m3) F(t)
      4 500 0.6 4.34 2 700 3 225
      注:石块与被撞物体的接触面积按堆积扇上最大石块的中、短径所在平面面积的10%计算;泥石流速度按沟口以内沟道速度(表 3)的50%计算.
      下载: 导出CSV
    • Chen, X.Q., Chen, N.S., Cui, P., 2004. Calculation of discharge of debris flow induced by glacier lake outburst. Journal of Glaciology and Geocryology, 26(3): 357-362 (in Chinese with English abstract). http://www.cqvip.com/QK/93756X/200403/9908151.html
      Cui, P., Yang, K., Chen, J., 2003. Relationship between occurrence of debris flow and antecedent precipitation: taking the Jiangjia Gully as an example. Science of Soil and Water Conservation, 1(1): 11-15 (in Chinese with English abstract). http://www.cnki.com.cn/Article/CJFDTotal-STBC200301005.htm
      Lin, C.W., Liu, S.H., Lee, S.Y., et al., 2006. Impacts of the Chi-Chi earthquake on subsequent rainfall-induced landslides in Central Taiwan. Engineering Geology, 86(2-3): 87-101. doi: 10.1016/j.enggeo.2006.02.010
      Lin, C.W., Shieh, C.L., Yuan, B.D., et al., 2004. Impact of Chi-Chi earthquake on the occurrence of landslides and debris flows: example from the Chenyulan River watershed, Nantou, Taiwan. Engineering Geology, 71(1-2): 49-61. doi: 10.1016/S0013-7952(03)00125-X
      Liu, C.N., Huang, H.F., Dong, J.J., 2008. Impacts of September 21, 1999 Chi-Chi earthquake on the characteristics of gully-type debris flows in Central Taiwan. Natural Hazards, 47(3): 349-368. doi: 10.1007/s11069-008-9223-9
      Tan, W.P., Han, Q.Y., 1992. Study on regional critical rainfall indices of debris flow in Sichuan Province. Journal of Catastrophology, 7(2): 37-42 (in Chinese with English abstract). http://www.researchgate.net/publication/289099372_Study_on_regional_critical_rainfall_indices_of_debris_flow_in_Sichuan_Province
      Tang, C., Qi, X., Ding, J., 2010. Dynamic analysis on rainfall-induced landslide activity in high seismic intensity areas of the Wenchuan earthquake using remote sensing image. Earth Science—Journal of China University of Geosciences, 35(2): 317-323 (in Chinese with English abstract). doi: 10.3799/dqkx.2010.033
      Tang, C., Zhu, J., Li, W.L., et al., 2009. Rainfall-triggered debris flows following the Wenchuan earthquake. Bulletin of Engineering Geology and Environment, 68(2): 187-194. doi: 10.1007/s10064-009-0201-6
      Yu, B., 2008a. Research on the calculating density by the deposit of debris flows. Acta Sedimentological Sinaca, 26(5): 789-796 (in Chinese with English abstract). http://en.cnki.com.cn/Article_en/CJFDTOTAL-CJXB200805013.htm
      Yu, B., 2008b. Study on the mean velocity of viscous debris flows. Advances in Earth Science, 23(5): 524-532 (in Chinese with English abstract). http://en.cnki.com.cn/Article_en/CJFDTOTAL-DXJZ200805015.htm
      Yu, B., 2010. Study on the method for deposition depth calculation of debris flow with different densities. Journal of Disaster Prevention and Mitigation Engineering, 23(2): 207-211 (in Chinese with English abstract). http://d.wanfangdata.com.cn/Periodical/dzxk201002016
      Zhang, S.C., Hungr, O., Slaymaker. O., 1996. The calculation of impact force of boulders in debris flow. In: Du, R., ed., Debris flow observation and research. Sciences Press, Beijing, 67-72 (in Chinese).
      陈晓清, 陈宁生, 崔鹏, 2004. 冰川终碛湖溃决泥石流流量计算. 冰川冻土, 26(3): 357-362. doi: 10.3969/j.issn.1000-0240.2004.03.018
      崔鹏, 杨坤, 陈杰, 2003. 前期降雨对泥石流形成的贡献—以蒋家沟泥石流形成为例. 中国水土保持科学, 1(1): 11-15. doi: 10.3969/j.issn.1672-3007.2003.01.005
      谭万沛, 韩庆玉, 1992. 四川省泥石流预报的区域临界雨量指标研究. 灾害学, 7(2): 37-42. https://www.cnki.com.cn/Article/CJFDTOTAL-ZHXU199202007.htm
      唐川, 齐信, 丁军, 2010. 汶川地震高烈度区暴雨滑坡活动的遥感动态分析. 地球科学——中国地质大学学报, 35(2): 317-323. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX201002017.htm
      余斌, 2008a. 根据泥石流沉积物计算泥石流容重的方法研究. 沉积学报, 26(5): 789-796. https://www.cnki.com.cn/Article/CJFDTOTAL-CJXB200805013.htm
      余斌, 2008b. 粘性泥石流的平均运动速度研究. 地球科学进展, 23(5): 524-532. https://www.cnki.com.cn/Article/CJFDTOTAL-DXJZ200805015.htm
      余斌, 2010. 不同容重的泥石流淤积厚度计算方法研究. 防灾减灾工程学报, 23(2): 207-211. https://www.cnki.com.cn/Article/CJFDTOTAL-DZXK201002017.htm
      章书成, Hungr, O., Slaymaker, O., 1996. 泥石流中巨石冲击力计算. 见: 杜榕桓编, 泥石流观测与研究. 北京: 科学出版社, 67-72.
    • 加载中
    图(9) / 表(4)
    计量
    • 文章访问数:  4006
    • HTML全文浏览量:  643
    • PDF下载量:  235
    • 被引次数: 0
    出版历程
    • 收稿日期:  2010-07-29
    • 刊出日期:  2011-01-01