• 中国出版政府奖提名奖

    中国百强科技报刊

    湖北出版政府奖

    中国高校百佳科技期刊

    中国最美期刊

    Volume 39 Issue 4
    Apr.  2014
    Turn off MathJax
    Article Contents
    Cao Yangbing, Yan Echuan, Hu Dexin, Ji Huibin, 2014. Calculation Methods of Rock Mass Discontinuity Orientation Measured by Borehole Camera Technology and Technology Reliability. Earth Science, 39(4): 473-480. doi: 10.3799/dqkx.2014.045
    Citation: Cao Yangbing, Yan Echuan, Hu Dexin, Ji Huibin, 2014. Calculation Methods of Rock Mass Discontinuity Orientation Measured by Borehole Camera Technology and Technology Reliability. Earth Science, 39(4): 473-480. doi: 10.3799/dqkx.2014.045

    Calculation Methods of Rock Mass Discontinuity Orientation Measured by Borehole Camera Technology and Technology Reliability

    doi: 10.3799/dqkx.2014.045
    • Received Date: 2013-06-19
    • Publish Date: 2014-04-15
    • For the issue that borehole camera technology only is applied to the vertical borehole currently, the calculation process for discontinuity orientation in inclined borehole is presented in this paper. With the circle centre of drill orifice as the origin, the left-handed Cartesian coordinate system is constructed and the precise analytic formulas for discontinuity orientation in inclined borehole are obtained. On this basis, the IDOIB software is developed using C# programming language. The validity of analytic formulas and program are verified by the principle of borehole camera technology. In addition, the PVC pipe experiments are conducted to examine the reliability of borehole camera technology for measurement of discontinuity orientation. Results show that: (1) For vertical holes, absolute errors of dip directions range from -3° to 4°, and those of dips range from -1.5° to 1.0°. The technology is reliable for measurement of discontinuity orientation in vertical boreholes, and it can satisfy the needs of rock engineering. (2) For inclined PVC pipes with trend of 270° and plunge of 25°, the reliability degree of discontinuity orientation is 0.10; while inclined PVC pipes with trend of 176° and plunge of 60°, the reliability degree of discontinuity orientation is 0.67. The difference of pipe plunge results in the reliability difference of discontinuity orientation. (3) The reliability of discontinuity orientation should be high (the reliability degree is no less than 0.8) for general rock engineering, so the plunge of inclined borehole should be no less than 71°.

       

    • loading
    • Cunningham, J.K., 2004. Application of Ground-Penetrating Radar, Digital Optical Borehole Images, and Cores for Characterization of Porosity Hydraulic Conductivity and Paleokarst in Biscayne Aquifer, Southeastern Florida, USA. Journal of Applied Geophysics, 55(1-2): 61-76. doi: 10.1016/j.jappgeo.2003.06.005
      Cunningham, J.K., Carlson, J.I., Hurley, N.F., 2004. New Method for Quantification of Vuggy Porosity from Digital Optical Borehole Images as Applied to the Karstic Pleistocene Limestone of the Biscayne Acquifer, Southeastern Florida. Journal of Applied Geophysics, 55(1-2): 77-90. doi: 10.1016/j.jappgeo.2003.06.006
      Ge, X.R., Wang, C.Y., 2001. Digital Panoramic Borehole Camera Technique and Digital Borehole. Underground Space, 21(4): 254-261 (in Chinese with English abstract). http://d.wanfangdata.com.cn/Periodical/dxkj200104002
      Hamm, S.Y., Kim, M.S., Cheong, J.Y., et al., 2007. Relationship between Hydraulic Conductivity and Fracture Properties Estimated from Packer Tests and Borehole Data in a Fractured Granite. Engineering Geology, 92(1-2): 73-87. doi: 10.1016/j.enggeo.2007.03.010
      Kanaori, Y., 1983. The Observation of Crack Development around an Underground Rock Chamber by Borehole Television System. Rock Mechanics and Rock Engineering, 16(2): 133-142. doi: 10.1007/BF01032795
      Kong, G.S., 2005. The Application of Borehole Acoustic Televiewer Logging Results to the Classification of Rock Weathering Degrees. Geophysical & Geochemical Exploration, 29(4): 367-368, 373 (in Chinese with English abstract). http://www.cnki.com.cn/Article/CJFDTotal-WTYH200504022.htm
      Liang, H.W., Wu, S.H., Mu, L.X., et al., 2013. Base Level Cyclic Controls on the Fluvial Reservoir Physical Properties and Sonic Logging Response. Earth Science—Journal of China University of Geosciences, 38(5): 1135-1142 (in Chinese with English abstract). doi: 10.3799/dqkx.2013.113
      Lo, H.C., Chou, P.Y., Hsu, S.M., et al., 2012. Using Borehole Prospecting Technologies to Determine the Correlation between Fracture Properties and Hydraulic Conductivity: A Case Study in Taiwan. Journal of Environmental and Engineering Geophysics, 17(1): 27-37. doi: 10.2113/JEEG17.1.27
      Luo, M., Pan, H.P., Zhao, Y.G., et al., 2008. Natural Radioactivity Logs and Interpretation from the CCSD Main Hole. Earth Science—Journal of China University of Geosciences, 33(5): 661-671 (in Chinese with English abstract). doi: 10.3799/dqkx.2008.081
      Ma, F., Chen, G., Hu, C., et al., 2011. Change of Permeability Tensors in Fractured Rock Mass Based on Intelligent Drillhole Optical Imager. Chinese Journal of Geotechnical Engineering, 33(3): 496-500 (in Chinese with English abstract). http://www.cqvip.com/QK/95758X/201103/37014720.html
      Mao, J.Z., 1994. Ultrasonic Imaging Borehole TV and Its Application to Rock Engineering. Chinese Journal of Rock Mechanics and Engineering, 13(3): 247-260 (in Chinese with English abstract). http://en.cnki.com.cn/Article_en/CJFDTOTAL-YSLX403.006.htm
      Mao, J.Z., Chen, Q.C., Wang, C.H., 2008. Application of Acoustic Borehole Televiewer to Measurement of In-Situ Stress. Chinese Journal of Geotechnical Engineering, 30(1): 46-50 (in Chinese with English abstract). http://www.researchgate.net/publication/289046975_Application_of_acoustic_borehole_televiewer_to_measurement_of_in-situ_stress
      Wang, C.Y., Hu, P.L., Sun, W.C., 2010. Method for Evaluating Rock Mass Integrity Based on Borehole Camera Technology. Rock and Soil Mechanics, 31(4): 1326-1330 (in Chinese with English abstract). http://www.researchgate.net/publication/288617719_Method_for_evaluating_rock_mass_integrity_based_on_borehole_camera_technology
      Wang, C.Y., Law, K.T., 2005. Review of Borehole Camera Technology. Chinese Journal of Rock Mechanics and Engineering, 24(19): 3440-3448 (in Chinese with English abstract). http://en.cnki.com.cn/Article_en/CJFDTOTAL-YSLX200519005.htm
      Wang, C.Y., Zhong, S., Sun, W.C., 2009. Study of Connectivity of Discontinuities of Borehole Based on Digital Borehole Images. Chinese Journal of Rock Mechanics and Engineering, 28(12): 2405-2410 (in Chinese with English abstract). http://d.wanfangdata.com.cn/Periodical/yslxygcxb200912004
      Williams, J.H., Johnson, C.D., 2004. Acoustic and Optical Borehole-Wall Imaging for Fractured-Rock Aquifer Studies. Journal of Applied Geophysics, 55(1-2): 151-159. doi: 10.1016/j.jappgeo.2003.06.009
      Wu, J., Feng, S.K., Li, H.J., 2011. Study of Automatically Extracting Structural Plane Parameters from Borehole Images. Rock and Soil Mechanics, 32(3): 951-957 (in Chinese with English abstract). http://www.researchgate.net/publication/286361474_Study_of_automatically_extracting_structural_plane_parameters_from_borehole_images
      Yang, J., Yan, E.C., Ji, H.B., et al., 2011. Digital Drillhole Images Based Identification of Discontinuity Classification and Development in Deep Rocks. Journal of Engineering Geology, 19(3): 332-337 (in Chinese with English abstract). http://d.wanfangdata.com.cn/Periodical/gcdzxb201103006
      Zhou, K.P., Gao, F., Hu, J.H., et al., 2007. Monitoring and Analysis of Fracture Development in Pre-Splitting Hole of Cave Inducement of Roof. Chinese Journal of Rock Mechanics and Engineering, 26(5): 1034-1040 (in Chinese with English abstract). http://www.oalib.com/paper/1485089
      葛修润, 王川婴, 2001. 数字式全景钻孔摄像技术与数字钻孔. 地下空间, 21(4): 254-261. doi: 10.3969/j.issn.1673-0836.2001.04.002
      孔广胜, 2005. 利用钻孔超声成像的图像特征进行岩石风化程度分类. 物探与化探, 29(4): 367-368, 373. doi: 10.3969/j.issn.1000-8918.2005.04.023
      梁宏伟, 吴胜和, 穆龙新, 等, 2013. 基准面旋回对河流相储层物性差异及声波测井影响. 地球科学——中国地质大学学报, 38(5): 1135-1142. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX201305027.htm
      骆淼, 潘和平, 赵永刚, 等, 2008. 中国大陆科学钻探主孔自然放射性测井及其解释. 地球科学——中国地质大学学报, 33(5): 661-671. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200805012.htm
      马峰, 陈刚, 胡成, 等, 2011. 利用钻孔成像研究基岩地区的渗透张量变化规律. 岩土工程学报, 33(3): 496-500. https://www.cnki.com.cn/Article/CJFDTOTAL-YTGC201103033.htm
      毛吉震, 1994. 超声波成象钻孔电视及其在岩石工程中的应用. 岩石力学与工程学报, 13(3): 247-260. doi: 10.3321/j.issn:1000-6915.1994.03.006
      毛吉震, 陈群策, 王成虎, 2008. 超声波钻孔电视在地应力测量研究中的应用. 岩土工程学报, 30(1): 46-50. doi: 10.3321/j.issn:1000-4548.2008.01.006
      王川婴, 胡培良, 孙卫春, 2010. 基于钻孔摄像技术的岩体完整性评价方法. 岩土力学, 31(4): 1326-1330. doi: 10.3969/j.issn.1000-7598.2010.04.055
      王川婴, Law, K.T., 2005. 钻孔摄像技术的发展与现状. 岩石力学与工程学报, 24(19): 3440-3448. doi: 10.3321/j.issn:1000-6915.2005.19.006
      王川婴, 钟声, 孙卫春, 2009. 基于数字钻孔图像的结构面连通性研究. 岩石力学与工程学报, 28(12): 2405-2410. doi: 10.3321/j.issn:1000-6915.2009.12.004
      吴剑, 冯少孔, 李宏阶, 2011. 钻孔成像中结构面自动判读技术研究. 岩土力学, 32(3): 951-957. doi: 10.3969/j.issn.1000-7598.2011.03.051
      杨举, 晏鄂川, 季惠彬, 等, 2011. 基于数字钻孔影像的深部结构面类型识别及发育特征研究. 工程地质学报, 19(3): 332-337. doi: 10.3969/j.issn.1004-9665.2011.03.006
      周科平, 高峰, 胡建华, 等, 2007. 顶板诱导崩落预裂钻孔裂隙发育监测与分析. 岩石力学与工程学报, 26(5): 1034-1040. doi: 10.3321/j.issn:1000-6915.2007.05.024
    • 加载中

    Catalog

      通讯作者: 陈斌, bchen63@163.com
      • 1. 

        沈阳化工大学材料科学与工程学院 沈阳 110142

      1. 本站搜索
      2. 百度学术搜索
      3. 万方数据库搜索
      4. CNKI搜索

      Figures(7)  / Tables(3)

      Article views (3510) PDF downloads(582) Cited by()
      Proportional views

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return