• 中国出版政府奖提名奖

    中国百强科技报刊

    湖北出版政府奖

    中国高校百佳科技期刊

    中国最美期刊

    Volume 26 Issue 4
    Jul.  2001
    Turn off MathJax
    Article Contents
    Deng Yiming, 2001. MAIN ENGINEERING GEOLOGICAL PROBLEMS IN OPTION OF ZHICHENG-WANXIAN RAILWAY. Earth Science, 26(4): 419-423.
    Citation: Deng Yiming, 2001. MAIN ENGINEERING GEOLOGICAL PROBLEMS IN OPTION OF ZHICHENG-WANXIAN RAILWAY. Earth Science, 26(4): 419-423.

    MAIN ENGINEERING GEOLOGICAL PROBLEMS IN OPTION OF ZHICHENG-WANXIAN RAILWAY

    • Received Date: 2001-04-05
    • Publish Date: 2001-07-25
    • It is very important to choose the right controlling line scheme as the engineering geological conditions are very complicated in Zhicheng-Wanxian railway. The paper analyzes the geological background in the area and summarizes its characteristics and laws of engineering geology and hydrogeology and finally figures out the key geological problems of controlling line scheme in order to determine the principles of the engineering geological locations and the direction of alternative scheme.

       

    • loading
    • 加载中

    Catalog

      通讯作者: 陈斌, bchen63@163.com
      • 1. 

        沈阳化工大学材料科学与工程学院 沈阳 110142

      1. 本站搜索
      2. 百度学术搜索
      3. 万方数据库搜索
      4. CNKI搜索

      Figures(4)  / Tables(2)

      Article views (3806) PDF downloads(11) Cited by()
      Proportional views

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return