Citation: | MA Shu-zhi, JIA Hong-biao, TANG Hui-ming, 2002. Analogy Method with Stable Side Shape to Predict Reservoir Side Rebuilding of Rock Shore. Earth Science, 27(2): 231-234. |
[1] |
蔡鹤生, 唐朝晖, 周爱国. 三峡水利枢纽库区巫山县城新址地质环境质量预断评价[J]. 工程地质学报, 1998, 23 (3): 269-274. https://www.cnki.com.cn/Article/CJFDTOTAL-GCDZ803.013.htm
CAI H S, TANG Z H, ZHOU A G. Quality prejudge evaluation of geoenvironment of the new city of Wushan county in the reservoir area of the Three Gorges Project [J]. Journal of Engineering Geology, 1998, 23(3): 269274. https://www.cnki.com.cn/Article/CJFDTOTAL-GCDZ803.013.htm
|
[2] |
殷跃平. 三峡库区移民迁建地质灾害研究[J]. 中国地质灾害与防治学报, 1998, (增): 59-66. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGDH8S1.009.htm
YIN Y P. Research on geologic hazards of relocation construction at the Three Gorges Reservoir, the Yangtze River [J]. Chinese Journal of Geological Hazard and Control, 1998, (suppl): 59-66. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGDH8S1.009.htm
|
[3] |
张咸恭, 王思敬, 张倬元, 等. 中国工程地质学[M]. 北京: 科学出版社, 2000.
ZHANG X G, WANG S J, ZHANG Z Y, et al. Engineering geology in China[M]. Beijing: Science Press, 2000.
|
[4] |
张倬元, 王士天, 王兰生, 等. 工程地质分析原理[M]. 北京: 地质出版社, 1993.
ZHANG Z Y, WANG S T, WANG L S, et al. Analytical principle of engineering geology[M]. Beijing: Geological Publishing House, 1993.
|
[5] |
蔡述明, 杜耘, 黄进良, 等. 长江中游洪涝灾害的成因与监测决策支持系统的建立[J]. 地球科学———中国地质大学学报, 2001, 26(6): 638-642. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200106013.htm
CAI S M, DU Y, HUANG J L, et al. Causes of flooding and water logging in middle reaches of the Yangtze River and construction of decision making support system for monitoring and evaluation of flooding and water logging hazards[J]. Earth Science—Journal of China University of Geosciences, 2001, 26(6): 638-642. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200106013.htm
|
[6] |
刘世凯, 宋春节, 袁涛, 等. 长江三峡工程库区交通工程地质环境研究[J]. 地球科学———中国地质大学学报, 2001, 26(4): 340-342. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200104002.htm
LIU S K, SONG C J, YUAN T, et al. Research on communication engineering geology environment in the Three Gorges Reservoir Area[J]. Earth Science—Journal of China University of Geosciences, 2001, 26(4): 340-342. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200104002.htm
|
[7] |
吴永锋, 石林. 三峡工程库区公路复建工程主要地质病害及防治对策[J]. 地球科学———中国地质大学学报, 2001, 26(4): 402-405. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200104018.htm
WU Y F, SHI L. Major geological hazards and preservation of road rebuilding engineering in the Three Gorges Engineering reservoir area[J]. Earth Science—Journal of China University of Geosciences, 2001, 26(4): 402-405. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200104018.htm
|
[8] |
晏鄂川, 唐辉明, 杨裕云, 等. 陆浑水库坝基断层破碎带渗透稳定性评价[J]. 地球科学———中国地质大学学报, 2001, 26(1): 80-92. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200101017.htm
YAN E C, TANG H M, YANG Y Y, et al. A systemic evaluation of seepage stability for fracture zone in Luhun dam foundation[J]. Earth Science—Journal of China University of Geosciences, 2001, 26(1): 80-92. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200101017.htm
|
[9] |
王学潮, 张辉, 刘振红, 等. 南水北调西线工程地质灾害初步研究[J]. 地球科学———中国地质大学学报, 2001, 26(3): 297-303. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200103012.htm
WANG X C, ZHANG H, LIUZ H, et al. Geological hazards about west-line project of water diversion from upper Yangtze River into upper Yellow River[J]. Earth Science — Journal of China University of Geosciences, 2001, 26 (3): 297-303. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200103012.htm
|