Citation: | ZHANG Yong, TIAN Sheng-long, ZHAO Yun-yun, 2008. Groundwater Numerical Simulation and Forecasting of Heilongdong Spring Area. Earth Science, 33(5): 693-698. |
Chen, C. X., Tang, Z. H., 1990. Problems in numerical simulation of groundwater flow. China university of Geosciences Press, Wuhan (in Chinese).
|
Fu, H. L., Li, L., Liu, B. C., 2002. Theoretical forecast model of rainfall and applicationin engineering. China Railway Science, 23 (4): 62-66 (in Chinese with Englishabstract).
|
Fu, Y. L., 2002. Numerical simulation of karst ground water system in South Hanxing hydrogeologic unit. Carsologica Sinica, 21 (4): 269-275 (in Chinese with Englishabstract).
|
Lu, W. X., 2003. Approach on boundary conditionin numeri-cal si mulation of groundwater flows. Journal of Hydraulic Engineering, (3): 33-36 (in Chinese with English abstract).
|
Wang, J. Q., Wu, Y. F., Qian, J. Z., et al., 2005. Isoparametric finite element3D numerical model for fracture-karst flow in Jinan springszone. Coal Geology & Exploration, 33 (3): 39-41 (in Chinese with English abstract).
|
Zhang, G. H., Fei, Y., H., Yang, L. Z., et al., 2006. Responses of ground water recharge and pumpage tochange in precipitation in Hebei Plain. Earth Science—Journal of China University of Geosciences, 31 (6): 879-884 (in Chinese with English abstract).
|
陈崇希, 唐仲华, 1990. 地下水流动问题数值方法. 武汉: 中国地质大学出版社.
|
傅鹤林, 李亮, 刘宝琛, 2002. 降雨量预测理论模型及其工程应用研究. 中国铁道科学, 23 (4): 62-66. doi: 10.3321/j.issn:1001-4632.2002.04.013
|
付延玲, 2002. 邯邢水文地质南单元岩溶地下水系统数值预报. 中国岩溶, 21 (4): 269-275. doi: 10.3969/j.issn.1001-4810.2002.04.007
|
卢文喜, 2003. 地下水运动数值模拟过程中边界条件问题探讨. 水利学报, (3): 33-36.
|
汪家权, 吴义锋, 钱家忠, 等, 2005. 济南泉域岩溶地下水三维等参有限元数值模拟. 煤田地质与勘探, 33 (3): 39-41. doi: 10.3969/j.issn.1001-1986.2005.03.012
|
张光辉, 费宇红, 杨丽芝等, 2006. 地下水补给与开采量对降水变化响应特征: 以京津以南河北平原为例. 地球科学——中国地质大学学报, 31 (6): 879-884. https://www.cnki.com.cn/Article/CJFDTOTAL-DQKX200606019.htm
|